No Result
View All Result
  • Private Data
  • Membership options
  • Login
  • COUNTRY
    • ITALY
    • IBERIA
    • FRANCE
    • UK&IRELAND
    • BENELUX
    • DACH
    • SCANDINAVIA&BALTICS
  • PRIVATE EQUITY
  • VENTURE CAPITAL
  • PRIVATE DEBT
  • DISTRESSED ASSETS
  • REAL ESTATE
  • FINTECH
  • GREEN
  • PREMIUM
    • ItaHubHOT
      • ItaHub Legal
      • ItaHub Tax
      • ItaHub Trend
    • REPORT
    • INSIGHT VIEW
    • Private Data
Subscribe
  • COUNTRY
    • ITALY
    • IBERIA
    • FRANCE
    • UK&IRELAND
    • BENELUX
    • DACH
    • SCANDINAVIA&BALTICS
  • PRIVATE EQUITY
  • VENTURE CAPITAL
  • PRIVATE DEBT
  • DISTRESSED ASSETS
  • REAL ESTATE
  • FINTECH
  • GREEN
  • PREMIUM
    • ItaHubHOT
      • ItaHub Legal
      • ItaHub Tax
      • ItaHub Trend
    • REPORT
    • INSIGHT VIEW
    • Private Data
Home GREEN

Beyond the grid: Why data centers must take power into their own hands

dcdby dcd
September 27, 2025
Reading Time: 6 mins read
in GREEN, UK&IRELAND
Share on FacebookShare on Twitter

Data center growth has always been fast. Today, it’s faster than the grid powering them can cope with. As AI, high-performance computing (HPC), and hyperscale cloud workloads devour electricity at record rates, operators are running up against a hard limit: they can build the facility, but they can’t switch it on. Multi-year grid delays are no longer the exception; they’re the rule. The solution emerging isn’t about waiting for infrastructure to catch up. It’s about building power and compute together, from day one, in locations chosen for business advantage rather than grid availability.

The forces driving the shift away from grid dependency

Several disruptive forces are converging to reshape how data centers approach their power strategy:

  • Demand growth at unprecedented scale: The International Energy Agency projects that global data center electricity consumption could double to nearly 945 TWh by 2030 – roughly the annual usage of Japan. AI training workloads, in particular, are pushing the boundaries of current grid supply.
  • Grid bottlenecks and delays: In markets such as the UK, new connections for large data centers can face wait times of up to a decade. In the US, grid interconnection queues and permitting processes are creating multi-year delays – often multiple times longer than the construction schedule for the facility itself.
  • Policy and reliability pressures: Regulators are beginning to treat large data centers as controllable loads. In Texas, new laws allow grid operators to shed data center demand in emergencies. Similar discussions are underway in Europe, highlighting the risk of relying solely on centralized grid supply.
  • Energy market volatility: Electricity price spikes – partly driven by data center demand – are forcing operators to seek more predictable and self-managed power strategies.

This convergence of demand, delay, and risk has created the conditions for a fundamental rethink: one in which grid dependency is no longer a given, and grid-optional strategies are becoming mainstream.

The industry’s answer: On-site generation and modular deployment

The sector’s response is taking several forms:

  • Behind-the-meter generation: More operators are investing in on-site gas turbines, battery energy storage systems, and renewable generation to create hybrid microgrids that can operate independently from the central grid.
  • Direct power sourcing: Some hyperscalers are negotiating dedicated generation plants – though these are often subject to regulatory scrutiny and community debate.
  • Modular, integrated power and IT systems: The latest developments in modular infrastructure now allow power generation and IT build-out to be designed, assembled, and commissioned in parallel, significantly reducing time-to-market.

This is where the Eaton-Siemens Energy collaboration represents a step forward. By combining Siemens Energy’s proven SGT-800 gas turbine technology – scalable, efficient, and hydrogen-ready – with Eaton’s modular data center infrastructure portfolio, the solution enables parallel construction of power generation and IT infrastructure. Operators are no longer bound to wait years for grid reinforcement; instead, they can power facilities in months, in locations optimized for fiber, land, and cooling, not just grid access.

A pathway to true grid independence

Grid-optional strategies are gaining momentum because they offer:

  • Speed to market: Deploying power and IT infrastructure concurrently can reduce time-to-go-live by up to two years compared to grid-reliant builds. The Eaton-Siemens model makes this a practical reality by offering pre-engineered modules that shorten design and construction timelines.
  • Scalability and flexibility: Modular architectures allow campuses to start at a smaller capacity and expand to hundreds of megawatts or gigawatts as demand grows. Siemens Energy’s turbines provide a backbone that can flex from initial deployments to full-scale campuses, while Eaton’s skidded electrical systems scale IT load in lockstep.
  • Built-in sustainability: Newer generation technologies can cut COâ‚‚ emissions by up to 50 percent compared to diesel alternatives. The Siemens turbine is hydrogen-ready, while Eaton’s integration ensures efficient distribution, UPS, and monitoring that reduce wasted energy. Together, this creates a pathway to net-zero readiness.
  • End-to-end integration: Standardized, skidded solutions now cover power generation, electrical distribution, UPS, racks, containment, and monitoring software, streamlining deployment and operations. Eaton brings deep expertise in modular data center systems, ensuring that the power plant and IT infrastructure operate as one ecosystem.

Location freedom: Facilities can be sited based on business and operational priorities, rather than being constrained by grid capacity. By pairing portable generation with modular IT blocks, the Eaton-Siemens approach allows operators to break the traditional geography of data centers wide open.

How this differs from other approaches

While microgrids, renewable PPAs, and small modular reactors (SMRs) are all part of the innovation landscape, most remain piecemeal in implementation or subject to longer regulatory and technology maturity timelines.

Fully integrated modular solutions, such as the joint offering from Eaton and Siemens Energy, stand apart because they are:

  • Proven: Built on industrial-grade generation technologies and modular infrastructure already deployed at scale worldwide.
  • Deployment-ready: Available today, with standardized designs that minimize engineering lead time and reduce project risk.
  • Sustainability-oriented: Designed with hydrogen-readiness and low-carbon baselines to meet tightening ESG requirements.
  • Scale-compatible: Capable of supporting both initial deployments and future campus expansions without significant redesign.

The uniqueness lies in the end-to-end integration: rather than piecing together a microgrid, turbine, UPS, and IT containers from multiple vendors, operators can adopt a single, harmonized ecosystem that brings generation and data center hardware together seamlessly.

The next phase of data center growth

In an environment where digital demand is accelerating and the energy supply chain is under strain, the ability to build and power a data center without waiting for the grid is transformative.

Grid-optional design is moving from a niche contingency to a strategic necessity – one that allows operators to take control of timelines, choose optimal locations, and define their own sustainability pathways.

As the Eaton-Siemens partnership demonstrates, this is not a future concept – it is a deployment-ready model that can cut years from project schedules and redefine where and how campuses come online.

For the next wave of data centers, the question may no longer be if they will adopt grid-independent infrastructure, but how quickly they can bring it online – and how partnerships like this one can make that transition both faster and greener.

More from Eaton

  • GettyImages-2197360232

    01 Sep 2025

    Sponsored

    Round three: Who’s in DC’s corner?

    Aligning on DC standards is key to powering next-generation AI data centers – or they risk being knocked out by inefficiency

  • 1Powering the data center of the future_page-0001

    Powering the data center of the future

    AI in the real world

    24 Sep 2025
  • Coilwinding at Badger Drive

    20 Feb 2025

    Sponsored

    Addressing the critical transformer shortage, empowering communities

    Eaton invests in new South Carolina transformer manufacturing site to power data centers, grid modernization, electrification and industrialization, bringing over 700 jobs to the local community

Read the orginal article: https://www.datacenterdynamics.com/en/opinions/beyond-the-grid-why-data-centers-must-take-power-into-their-own-hands/

Gateways to Italy

Gateways to Italy – Offer your services to funds and investors willing to explore opportunities in Italy. Become a partner!

Gateways to Italy – Offer your services to funds and investors willing to explore opportunities in Italy. Become a partner!

by Partner
June 6, 2023

Sign up to our newsletter

SIGN UP

Related Posts

DACH

White& Case advises NMi on acquisition of Phoenix Testlab

September 27, 2025
PRIVATE EQUITY

White & Case advises Solida Capital on acquisition of Italian furniture maker Giorgetti

September 27, 2025
GREEN

GAC Debuts Brand and New Models in Portugal, Marking a Milestone in Its European Expansion

September 26, 2025

ItaHub

Crypto-assets supervision rules in Italy, Banca d’Italia will supervise payment systems and Consob on market abuse

Crypto-assets supervision rules in Italy, Banca d’Italia will supervise payment systems and Consob on market abuse

November 4, 2024
Italy’s SMEs export toward 260 bn euros in 2025

Italy’s SMEs export toward 260 bn euros in 2025

September 9, 2024
With two months to go before the NPL Directive, in Italy the securitization rebus is still to be unraveled

With two months to go before the NPL Directive, in Italy the securitization rebus is still to be unraveled

April 23, 2024
EU’s AI Act, like previous rules on technology,  looks more defensive than investment-oriented

EU’s AI Act, like previous rules on technology, looks more defensive than investment-oriented

January 9, 2024

Co-sponsor

Premium

Italian private equity accelerates, driven by add-ons. BeBeez reports.

Italian private equity accelerates, driven by add-ons. BeBeez reports.

September 7, 2025
AlixPartners: Automotive, retail and manufacturing sectors may go through restructuring in 2025

AlixPartners: Automotive, retail and manufacturing sectors may go through restructuring in 2025

July 11, 2025
Funds vying for management consulting firm BIP, a CVC portfolio company. All deals in the sector

Funds vying for management consulting firm BIP, a CVC portfolio company. All deals in the sector

March 6, 2025
Private equity, Italy 2024 closes with 588 deals as for investments and divestments from 549 in 2023. Here is the new BeBeez’s report

Private equity, Italy 2024 closes with 588 deals as for investments and divestments from 549 in 2023. Here is the new BeBeez’s report

February 10, 2025
Next Post

European investigators raid Northern Data offices over tax fraud allegations, four arrested

EdiBeez srl

C.so Italia 22 - 20122 - Milano
C.F. | P.IVA 09375120962
Aut. Trib. Milano n. 102
del 3 aprile 2013

COUNTRY

Italy
Iberia
France
UK&Ireland
Benelux
DACH
Scandinavia&Baltics

CATEGORY

Private Equity
Venture Capital
Private Debt
Distressed Assets
Real Estate
Fintech
Green

PREMIUM

ItaHUB
Legal
Tax
Trend
Report
Insight view

WHO WE ARE

About Us
Media Partnerships
Contact

INFORMATION

Privacy Policy
Terms&Conditions
Cookie Police

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • COUNTRY
    • ITALY
    • IBERIA
    • FRANCE
    • UK&IRELAND
    • BENELUX
    • DACH
    • SCANDINAVIA&BALTICS
  • PRIVATE EQUITY
  • VENTURE CAPITAL
  • PRIVATE DEBT
  • DISTRESSED ASSETS
  • REAL ESTATE
  • FINTECH
  • GREEN
  • PREMIUM
    • ItaHub
      • ItaHub Legal
      • ItaHub Tax
      • ItaHub Trend
    • REPORT
    • INSIGHT VIEW
    • Private Data
Subscribe
  • Login
  • Cart